Bathrooms & Kitchens · Greater Sacramento

Same oak cabinets.
A different kitchen.

The original oak cabinetry and layout stayed in this Citrus Heights renovation. A full-height stone backsplash, quieter stone countertops, and under-cabinet and toe-kick lighting gave the room a new focal point.

Finished kitchen renovation in Citrus Heights — stone counters, full-height backsplash, original oak cabinets kept
Citrus Heights kitchen renovation
Design and coordination by Nick Smith · June 2025.
Kept the original oak cabinets. Updated the counters, backsplash, and fixtures.
Original layout · Full-height stone backsplash · Under-cabinet and toe-kick lighting
See the kitchen case study

Know what you’re
paying for.

A remodel starts with clear answers. What’s included? Who’s doing the work? What happens if the scope changes? That’s the standard I want homeowners to expect.

  • A written scope you can compare line by line
  • Materials and installation details you can understand
  • Time to make a decision you’re comfortable with
Our focus

Bathrooms & kitchens.
That’s the specialty.

Kitchen and bath planning starts with the layout, the parts worth keeping, and the work behind the finishes.

Modern bathroom remodel with walk-in shower, marble-look tile and light wood vanity
Bathroom design & planning

Photo shown for design inspiration.

BathSmith Bathroom Remodeling

Plan the shower layout, wall system, ventilation, and storage before choosing finishes.

Walk-in ShowersTub-to-Shower ConversionsTile & WaterproofingVanities & FixturesFull Bath Remodels
Explore bathroom planning
Finished kitchen with original oak cabinets and new stone counters
Kitchen design & planning

KitchenSmith — Kitchen Remodeling

Decide what stays before specifying cabinetry, countertops, lighting, or fixtures. The Citrus Heights case study shows how those choices shaped a finished room.

See the kitchen case study
Explore kitchen planning

Finished range wall with full-height stone backsplash in Citrus Heights
The Smith Standard

A scope you can compare

Ask what the finish list includes, who orders each item and how the work is sequenced. A written scope makes it easier to compare quotes and plan around the days your kitchen or bath will be out of use.

Read the planning guide

Citrus Heights · Completed June 2025

A new finish around the original oak.

The original solid oak cabinets and layout were worth keeping. The design paired expressive veining on the full-height backsplash with quieter stone on the countertops. Lighting beneath the cabinets and at the toe-kick brought out the oak and stone.

Design, sourcing, and coordination by Nick Smith. Hired specialists handled stone fabrication and installation, electrical, and plumbing.

Finished kitchen from the doorway — stone counters, full-height backsplash, new appliances, original oak cabinets
Same doorway before the remodel — new appliances in, beige tile counters and red walls still in place

Drag the handle or tap Before or After. Same doorway and cabinets. The before photo shows the new appliances in place with the old tile counters. The after photo shows the finished stone.

Why we exist

Get the right trades on the same schedule.

“My dad taught me: somebody’s going to make a dollar on your job, and that’s fine. They should be paid fairly, and they should do good work.”

For me, that means knowing what the work requires, paying the people doing it fairly, and being clear about what’s included.

On this project, I ordered materials, protected what was staying, and made sure the specialists had what they needed when they arrived.

Same corner sink after — Kraus undermount sink set in stone with a Kohler gooseneck faucet
Corner sink before — beige tile counter and old double-basin top-mount sink against the red wall

Drag to compare the sink from nearly the same angle. The new fixtures — Kraus sink, Kohler faucet — came from Ferguson in Sacramento.

Chapter 01 — The Before

The layout was worth keeping.

The red walls, tile counters, and top-mount sink dated the room. The solid oak cabinets were in good condition, and the layout already worked.

Keeping those two elements let the project focus on the stone, fixtures, and lighting.

Tap any photo to enlarge. Measuring day — before a single order was placed.

Chapter 02 — The Plan

Measure before you order.

The sink wall and cabinet opening were measured before ordering the fixtures.

Appliance selections were made around the existing kitchen layout.

Left: the pass-through, mid-demo. Right: protection before demolition — the new appliances were covered before a hammer swung near them.

Chapter 03 — Demolition

Selective demolition.

Nick removed the tile counters and opened up the pass-through.

The appliances and cabinetry were protected while the surrounding finishes came out.

Left: tile debris staged for removal. Right: electrical materials organized by location.

Chapter 04 — The Work Nobody Sees

Coordinate the trade visits.

Switches, outlets, and lighting were laid out for the electrician ahead of installation.

The schedule included follow-up electrical work and a return visit for the plumber to move the gas line behind the range.

Left: the slab, on the crane. Right: the pairing decision, made standing in the warehouse.

Chapter 05 — Choosing the Stone

Choose the slabs together.

Full slabs were viewed side by side at the stone yard.

The more expressive veining went on the full-height backsplash. A quieter pattern went on the countertops.

Left: the clean slate. Right: the countertop-to-backsplash transition.

Chapter 06 — Install & Finish

Finish at the transitions.

The stone layout was planned around the turn from worktop to backsplash.

Under-cabinet and toe-kick lighting, new LG appliances, and fresh paint completed the room around the original oak.

The finished range wall — the dramatic stone, exactly where the slab-yard decision put it.

What actually changed

  • ✓ Tile counters out — stone counters in, with a full-height stone backsplash, vein-matched from counter to wall
  • ✓ Old double-basin sink out — Kraus undermount sink and Kohler faucet in (Ferguson, Sacramento)
  • ✓ New LG appliance package — range, microwave, dishwasher, refrigerator
  • ✓ Under-cabinet and toe-kick lighting; new outlets and GFCI protection; smart switches
  • ✓ Walls repainted — and the original oak cabinets kept, because they were worth keeping
  • ✓ Selective tear-out around the original cabinetry

A scope the trades can work from.

The cabinet decision shaped the materials, installation sequence, and budget.

One schedule kept the stone, electrical, and plumbing work in order, including the follow-up visits.

Kitchen planning

Decide what’s worth keeping
before you price anything.

The biggest kitchen savings rarely come from cheaper materials. They come from honest calls about what you already have. Work through the cabinet question first — it sets the size of everything after it — then plan the surfaces, fixtures and lighting around that decision.

The cabinet decision: four honest options

Keep & clean

What it means: the cabinets stay exactly as they are — a deep clean, minor touch-ups, maybe new hardware.

Right call when: the boxes are solid, the finish is sound, and the layout already works for how you cook.

Budget effect: the smallest line in the project — the money moves to the surfaces and fixtures people actually touch.

Refinish

What it means: the existing doors and boxes are stripped, sanded and given a new stain or paint finish.

Right call when: the wood is sound and the door style still works, but the color or finish is what dates the room.

Budget effect: a middle path — mostly skilled labor, with the cabinet boxes reused. Compare written scopes when pricing against replacement.

Reface

What it means: new doors and drawer fronts, with the existing boxes veneered to match. Boxes and layout stay put.

Right call when: the boxes are solid but the door style itself is what you want gone.

Budget effect: new doors, drawer fronts and finishes add cost. The existing cabinet layout stays.

Replace

What it means: new cabinets throughout, with the option to rethink the layout, storage, and footprint.

Right call when: boxes are failing or water-damaged, or the layout itself is the problem you’re solving.

Budget effect: usually the largest single line in a kitchen. Worth it when it’s needed — waste when it isn’t.

Worked example — Citrus Heights kitchen renovation

Same three questions we’d ask on any kitchen. Here’s how they answered out on the project above.

What we kept

  • The original solid oak cabinets — the bones were good
  • The existing layout — it already worked

What changed

  • Stone counters with a full-height stone backsplash
  • Kraus undermount sink and Kohler faucet
  • New LG appliance package
  • Under-cabinet lighting, new outlets and GFCI protection
  • Walls repainted — the red is gone

Who did the work

  • Nick: planning and measuring, sourcing, demolition, debris hauling, and project management throughout
  • Hired trades: electrical wiring, stone fabrication and installation, plumbing connections

Before any kitchen work begins

Decide first

Settle the layout and the keep / refinish / reface / replace call before anyone talks finishes or colors. That one decision frames the whole budget.

Verify in a written scope

Who supplies and who installs each item, what’s excluded, and how hidden conditions — rot, damage, out-of-level floors found at tear-out — get priced if they appear.

Before work begins

Materials confirmed or on site, protection planned for everything that stays, cleanup and debris handling agreed, and a final walkthrough set to check the finished work against the scope.

Bathroom planning

Three different jobs.
Three different scopes.

A tub-to-shower conversion, a shower replacement and a full bathroom update get quoted like they’re the same job. They’re not. Know which one you’re actually buying before you talk about colors, patterns or price.

Tub-to-Shower Conversion

What it includes: the tub comes out; a new shower base, wall system, valve and fixtures go into the same footprint; glass or a curtain finishes it.

What it doesn’t: changes to the vanity, toilet, or flooring outside the shower. Confirm whether the new base requires moving the drain.

Who it’s for: households that rarely use the tub and want a shower with a lower step-in.

Shower Replacement

What it includes: the old shower comes out to the studs; new base, waterproofing, wall system, valve, fixtures and glass go in — same footprint, same layout.

What it doesn’t: layout changes or work on the rest of the room.

Who it’s for: a leaking, cracked or dated shower in a room that otherwise works.

Full Bathroom Update

What it includes: the wet area plus vanity, toilet, flooring, lighting and paint — the whole room, planned as one scope.

What it doesn’t: moving walls or plumbing locations, unless that’s written into the scope on purpose.

Who it’s for: when the whole room is tired — not just the shower.

The decisions that actually set the scope

Drain location
The drain location determines which shower bases fit. Moving it can add floor access and plumbing work.
Wall system
Tile, acrylic or solid-surface panels decide how much grout you’ll clean, how the walls are waterproofed, and how long installation takes. Choose the system before the pattern.
Fixtures
The valve, showerhead and trim are chosen with the wall system — some combinations limit each other, so decide them together.
Glass
Frameless glass, a framed door or a curtain changes cost, cleaning and how open the shower feels — and glass needs the right backing in the wall.
Storage
Niches and shelves are built while the walls are open, not after they close. Decide where the shampoo lives before the wall system goes up.
Tear-out surprises
Rot, mold and tired plumbing hide behind old tubs and surrounds. A written scope should say how discoveries are handled and priced — before anyone signs.
Finished kitchen renovation in Citrus Heights
Citrus Heights kitchen renovation. Design and coordination by Nick Smith. Stone, electrical, and plumbing by hired specialists.

Before any bathroom work begins

Decide first

Which of the three jobs you’re doing — and the drain, glass and storage calls — before finishes. Scope first, colors second.

Verify in a written scope

The wall system and waterproofing named in writing, who is responsible for installation, how tear-out discoveries are priced, and what is excluded.

Before work begins

Fixtures and glass confirmed, the water shutoff plan clear, cleanup and debris handling agreed — and a final walkthrough where the water runs and every seam gets checked.

Planning tool — free, right here

Tub-to-Shower Planning Checklist

Thinking about losing the tub? Work through this in your own bathroom, tape measure in hand, before you talk finishes or prices. Tick items off as you go — nothing is submitted or saved.

Get occasional launch news, project stories, and new planning guides by email.

Budget planner

Build a working budget.

Use your own numbers or amounts from a written quote. Add the pieces you know about and set aside a contingency for surprises.

Your working budget
$0
  • Costs you entered$0
  • Contingency$0

This worksheet adds the figures you enter. It’s for planning only and does not provide market prices or a project quote.

Before you start a remodel.

Four conversations worth having before demolition day.

Define the scope

Decide what stays, what changes and how the room needs to work once it’s finished.

Compare written quotes

Look for line items covering materials, prep, disposal and how changes are priced.

Verify the contractor

Check the contractor’s license, confirm who will supervise the work and ask who handles permits.

Plan the walkthrough

Find out what’s covered under warranty and who will handle any items that remain after installation.

Founder
Nick Smith

Founder, Smith Remodeling Group
Citrus Heights, California


Nick brings in-home remodeling sales experience and a practical understanding of material selection and trade coordination.

A note from Nick
Working in residential remodeling taught me what homeowners need most: a clear scope, a price they can understand, and someone who keeps them informed.

A smith is a craftsman — someone who makes things properly, with their name on the work. That’s the standard: quality materials, professional craftsmanship, straightforward pricing, and a founder whose reputation is the business.

I’m building Smith Remodeling Group in Citrus Heights around three things: straightforward communication, a clear plan and respect for the home people are living in.

Follow the launch
Our local focus

Greater Sacramento,
starting close to home.

Founded in Citrus Heights, with a focus on Greater Sacramento and the communities we know best.

📍 Citrus Heights — Home BaseRosevilleRocklinFolsomGranite BayLincolnSacramentoFair OaksCarmichaelOrangevale

Questions, upfront.

Is Smith Remodeling Group a licensed contractor?

Smith Remodeling Group does not hold a California contractor license. The site currently offers planning information and launch updates. For construction, verify the license of the contractor you hire and contract directly with that business.

Can I book an estimate now?

Consultation booking is closed during pre-launch. Join the list for launch news, project stories, and planning guides.

Does the budget planner give me a quote?

Enter your own figures or amounts from a written quote. The planner totals them and adds a contingency. An itemized quote comes from the licensed contractor who reviews the scope.

What projects is Smith Remodeling Group focused on?

Bathrooms and kitchens, including shower layouts, tile, cabinetry, countertops and fixtures.

Follow the launch.

Get occasional launch news, project case studies, and new kitchen and bathroom planning guides.

Get launch updates

We’ll use your email for launch updates. See our privacy notice.